The main canal needs a sluice that has a suitable longitudinal slope so that water can be easily directed to the end of the path.
The water outlet to the outside of the wall should be wider
The end of the channel towards the separator should be completely blocked by the valve and the water flow path should be directed outwards.
The water conduction channel to the separator is completely blocked and empty of flow
At the outside of the wall, the output must be modified and the table connected to the wall
The water outlet has slowed down the flow of water due to the 90 degree break in the metal pipe towards the earthen pool, so it is recommended to drill and correct the canal in the same direction to the south.
The current water transfer route to the earthen pool is completely blocked.
The capacity of the existing pool is now full and mud completely covers its surface, which causes the water inlet to be pumped into the pool
It is recommended that the outlet water be directed to the new pool by placing the pipe in the same direction and also by placing a garbage net or running a relaxation pool at its entrance from the entry of solids and garbage. To be prevented.
The existing southern pool is larger in size and depth than the current pool. By making corrections and deepening, it can be better and more efficient and store more water with better quality. The use of geomembranes is recommended for its insulation.
Surface water collection plan on the east side of livestock-Performed
- Super User
- Environmental projects
- Hits: 161